A compressed air tank as a buffer and storage medium dampens the pulsation and compensates for fluctuating compressed air consumption in the network. In addition, a compressed air tank can be used as a condensate separator. We advise you on the dimensioning of the suitable compressed air tank, take over the commissioning and preparation for the testing of the tank according to the Industrial Safety Regulation by a central monitoring center (e.g. TÜV).
Overview compressed air tank
Type | Pressure vessels | High pressure vessel | Vacuum tank | Special containers |
Design | standing; lying | standing; lying | standing; lying | standing; lying |
Pressure range | 11 bar; 16 bar | 17 bar – 41 bar | -1 bar | on demand |
Volume | 50 l – 10.000 l | 50 l – 3.000 l | 50 l – 3.000 l | on demand |
Material | primed hot-dip galvanized inside/outside; stainless steel | primed hot-dip galvanized inside/outside; stainless steel | primed hot-dip galvanized inside/outside; stainless steel | primed hot-dip galvanized inside/outside; stainless steel |
Test specifications for compressed air tanks
The new version of the Industrial Safety Regulation in 2015 brought innovations regarding the testing obligations for pressure vessels.
§ 15 BetrSichV (Industrial Safety Regulation), testing before commissioning and before recommissioning after changes requiring testing
With the testing of printing systems requiring monitoring before re-commissioning and before initial start-up, it is determined after changes requiring testing whether
Pressure volume | Examination by |
<200 l | qualified person |
>200 l | Central monitoring center |
§ 16 BetrSichV, Recurring test
The content of recurrent inspections is the safe condition of the pressure system requiring monitoring with regard to operation. In addition, it shall be checked whether the period for the next periodic inspection has been fixed.
The inspection intervals are determined on the basis of the container documents in the safety assessment. In Germany, the maximum period for periodic inspections is 5 years for the internal inspection and 10 years for the strength test.
Pressure volume | Examination by |
<1.000 l | qualifeid person |
>1.000 l | Central montioring center |